Özemre Construction has successfully completed many contracting projects. You can find our references in this page.
AYDIN MINING
- Production and assembly of the filter cyclone colon connections to the purlin (2000 - 2001)
- Front coating and roofing (2000 - 2001)
|
more photos
|
BİRLİK GALVANİZ SAÇ SAN. VE TİC. A.Ş.
- Reinforcement of the primary colon (2003 - 2004)
- Reinforcement and adjustment of the crane beams (2003 - 2004)
- Removing the gaps between the ceiling crane tracks (2000 - 2001)
| |
BİTİNYA İNŞ. MÜH. LTD. ŞTİ.
- Construction of the fire escape stairs of Bursa Zübeydehanım Maternity Hospital (2008)
|
more photos
|
BORÇELİK ÇELİK SAN.TİC. A.Ş
- Maintenance and steel construction jobs inside the factory (2009 - 2010)
- Borçelik assembly jobs (2007 - 2008)
- Production and assembly of the bar supports and the bars (2007 - 2008)
|
more photos
|
BORUSAN MÜHENDİSLİK MAK. SAN .A.Ş
- Assembly of the 4. hall's ceiling crane track (2001 - 2002)
| |
BURHAN BÜTÜN
- Production and assembly of roofing of the wedding saloon (2009)
- Production and assembly of roofing of the wedding saloon (2002 - 2003)
| |
ÇİMTAŞ A.Ş.
- Disassembly of the paint drying oven (2008)
- Disassembly and assembly of the warehouse building (2007)
- Assembly and disassembly of the mobile operation furnace (2007 - 2008)
- Disassemby and assembly of 42 crane beams (2003 - 2004)
- Production and assembly of the building at the stock area using structural steel (2003 - 2004)
- Production of the 65 tons steel truss at the Afşin Elbistan Thermal Plant 713 AEB Machine House (2002 - 2003)
- 2 phosphate tanks and platforms (2002 - 2003)
- 20 ventillation grilles (2002 - 2003)
- 713 Project and Production (2002 - 2003)
- Division and coating of the dyehouse (2002 - 2003)
- The junkyard porch (2002 - 2003)
- Production of 40 sets of the wind energy towers' inner stairs platform (2002 - 2003)
- Production and assembly of the vehicle maintenance channel platform. (2002 - 2003)
- Changing the 3rd Hall's crane tracks (2002 - 2003)
- Assembly of the 3 tons crane beams and tracks of the sanding building (2001 - 2002)
- Production of 105 sets of the wind energy towers' inner stairs platform (2001 - 2002)
- Disassembly and assembly of the warehouse building behind the sports arena (2001 - 2002)
- Production and assembly of the tank loading / draining platform (2000 - 2001)
- Production of 85 sets of the wind energy towers' inner stairs platform (2000 - 2001)
- Production of 80 sets of the wind energy towers' aeration cascades (2000 - 2001)
- Production and assembly of the steel construction of the outside lengthwise welding machine (2000 - 2001)
- Production and assembly of the piping hall x-ray cabin (2000 - 2001)
- Production of the stainless steel water tank's stands (1996 - 2005)
|
more photos
|
ÇİMTAŞ BORU İMALAT LTD. ŞTİ.
- Various steel construction (2009 - 2010)
- Production and assembly of the sanding and dyeing cabin (2002 - 2003)
- Production and assembly of the conveyor of the sanding cabin (2002 - 2003)
- Production and assembly of the sanding and dyeing cabin's stair rail. (2002 - 2003)
|
more photos
|
EİSENMANN LACKTECHNIK GmbH CO.KG
- 120 tons steel construction for the system tank (2004 - 2007)
- 165 tons of steel construction for the walkway, platform, crane beam, stairs and stair rails (2004 - 2007)
| |
GEMLİK GÜBRE SANAYİ A.Ş.
- Gemlik Fertilizer Ammoniac Facility (1996 - 1997): The 101 – C excess heat boiler pipe coil's assembly and disassembly
- Assembly of the steel construction of the receipt warehouse (1996 - 1997)
- Roofing of the receipt warehouse (1996 - 1997)
| |
HCR MAKİNA LTD. ŞTİ.
- Production of the transfer handles at the TOFAŞ worksite. (2008 - 2009)
| |
İNEGÖL ORG. SAN BÖL. MÜDÜRLÜĞÜ
- Steel construction jobs of the mosque construction (2006 - 2009)
- Production and assembly of the bridge of the treatment plant pool (2006 - 2009)
|
more photos
|
OTOSAN OTOMOTİV SANAYİ A.Ş
- Production and assembly of the system tank – robot carrier (2007)
- Production and assembly of the new paint shop's pipe supports (2007)
| |
SIDDIK KARADAYI
- Production and assembly of the Petrol Ofisi canopy (1998 - 1999)
| |